Inquire Now
● Products / Research Services

Post-Translational Modification Detection
Phosphorylation · Acetylation · Ubiquitination

We offer Western blot/IP detection based on modification-specific antibodies, as well as mass-spectrometry-based post-translational modification (PTM) identification, covering common modification types such as phosphorylation, acetylation, ubiquitination, and methylation.

Purpose & Application Scenarios

Purpose

When you suspect that a change in a protein’s function isn’t due to a change in its expression level but rather a change in its modification state — such as phosphorylation or acetylation — PTM detection helps you confirm that "hidden" layer of regulation — answering "the amount of protein hasn’t changed, but has its ‘state’ changed."

Application Scenarios

Technical Principle & Applications

Technical Principle

Modification-specific antibodies recognize a particular modification site or type and are combined with immunoprecipitation enrichment followed by WB detection; mass spectrometry methods enrich modified peptides and use tandem mass spectrometry to identify modification sites and extent, enabling whole-proteome-scale modification-profile analysis.

Applications

Research into signaling pathway activation state, mechanisms regulating protein stability, drug mechanism of action research, etc.

Service Advantages

Multiple Modification Types

Phosphorylation, acetylation, ubiquitination, methylation

Timeline Assessed by Detection Method

Antibody-based or mass-spectrometry-based methods available

Profile + Analysis Report

Complete detection data delivered

Whole-Proteome Scale Available

Mass spectrometry enables in-depth modification-profile analysis

Delivery

By Detection Method & ScaleTimeline assessed and confirmed at contract signing
Deliverables: detection profile and an analysis report. We recommend discussing the target modification type and detection method with a technical advisor in advance.

Ordering Process

1

Requirement Discussion

Submit your experimental plan and objectives

2

Proposal Confirmation

Technical advisor confirms the protocol and timeline

3

Deposit & Order Placement

Pay a deposit of at least 50% of the project cost to enter production

4

Production & QC

Quality control documented throughout production

5

Delivery & Acceptance

Settle the balance and complete acceptance

Payment & Acceptance Terms

Project Deposit

Standard, custom, and large orders all require a deposit of at least 50% of the contract value to begin. The timing for the remaining balance is agreed separately for each project.

Acceptance

Please complete acceptance within 1 month of receiving the product or report. Any concerns about the deliverable should be raised within this window; we will respond within 2 business days.

Disclaimer: The turnaround times and technical parameters shown on this page are typical reference ranges; the order confirmation governs the actual terms. ↑ Back to top
My List
Clear
Take My List to Inquiry
My List 0