Inquire Now
● Products / Research Services

Gene Synthesis
Full-Length Gene Synthesis · Codon Optimization

Synthesizes a gene of interest directly from sequence information without a template, with optional cloning into a specified vector. Supports synthesis of long fragments, high-GC, and repetitive sequences, with free codon optimization to improve target gene expression.

Purpose & Application Scenarios

Purpose

When the sequence you need is hard to obtain from an existing plasmid (for example, it requires codon optimization, is an artificially designed sequence, or the original source is unavailable), de novo gene synthesis lets you "build" that DNA directly to your design — answering "if nothing off-the-shelf exists, how do you get this sequence from scratch."

Application Scenarios

Technical Principle & Applications

Technical Principle

The target sequence is split into multiple overlapping oligonucleotides, assembled into a complete gene fragment by PCR or ligation-based assembly (Gibson Assembly/OE-PCR), then cloned into a vector and verified by full-length sequencing. Codon optimization uses the host's codon usage bias to adjust codon usage — without changing the amino acid sequence — removing rare codons and unfavorable secondary structures.

Applications

Protein expression, antibody genes, enzyme engineering, metabolic pathway construction, vaccine antigen design, etc.

Service Advantages

Free Codon Optimization

Adapted for hosts such as E. coli, yeast, mammalian, and insect cells

Typically 7-10 Business Days

Complex sequences discussed separately for timeline

Full-Length Sequencing Verification

Delivered as a sequencing-verified plasmid and sequence file

Complex Sequences Supported

Long fragments, high-GC, and repetitive sequences can all be synthesized

Delivery

Standard Gene (<1kb)About 7-10 business days
Long Fragment / Complex SequenceTimeline confirmed separately based on complexity
Deliverables: a sequencing-verified plasmid (typically 4μg lyophilized or as a bacterial stab) and the sequence file.

Ordering Process

1

Requirement Discussion

Submit your experimental plan and objectives

2

Proposal Confirmation

Technical advisor confirms the protocol and timeline

3

Deposit & Order Placement

Pay a deposit of at least 50% of the project cost to enter production

4

Production & QC

Quality control documented throughout production

5

Delivery & Acceptance

Settle the balance and complete acceptance

Payment & Acceptance Terms

Project Deposit

Standard, custom, and large orders all require a deposit of at least 50% of the contract value to begin. The timing for the remaining balance is agreed separately for each project.

Acceptance

Please complete acceptance within 1 month of receiving the product or report. Any concerns about the deliverable should be raised within this window; we will respond within 2 business days.

Disclaimer: The turnaround times and technical parameters shown on this page are typical reference ranges; the order confirmation governs the actual terms. ↑ Back to top
My List
Clear
Take My List to Inquiry
My List 0