Inquire Now
● Products / Research Services

Custom Disease Model Construction
Gene-Edited Disease Models

Based on CRISPR/Cas9 and other gene editing technologies, we offer custom construction of disease models in mice, rats, and other model animals, including knockout, conditional knockout, knock-in, and point mutation, covering the full process from design through embryo manipulation, founder identification, and breeding/expansion.

Purpose & Application Scenarios

Purpose

When cell-level research can no longer answer your question, and you need to verify gene function or model disease at the whole-organism level, a custom gene-edited animal model is the foundational tool for in vivo research — answering "what does this gene actually do in a real living organism."

Application Scenarios

Technical Principle & Applications

Technical Principle

Cas9/sgRNA and a modification template are introduced into fertilized eggs by pronuclear microinjection or electroporation. Founder mice are obtained after embryo transfer, and successfully edited individuals are identified by genotyping (PCR + sequencing), then bred to establish a stably inherited model strain.

Applications

Disease mechanism research, drug screening and evaluation, in vivo verification of gene function, etc.

Service Advantages

Multiple Editing Types

Knockout, conditional knockout, knock-in, and point mutation, all available

Typically 4-6 Months

Depends on model complexity

Genotyping Report

PCR + sequencing confirms successfully edited individuals

Full-Process Breeding & Expansion

From founder identification to a stable strain, all in one place

Delivery

Custom Animal Model ConstructionAbout 4-6 months, depending on model complexity
Deliverables: a genotyping report and model animals/frozen embryos. Please thoroughly discuss the feasibility of the model design with a technical advisor in advance.

Ordering Process

1

Requirement Discussion

Submit your experimental plan and objectives

2

Proposal Confirmation

Technical advisor confirms the protocol and timeline

3

Deposit & Order Placement

Pay a deposit of at least 50% of the project cost to enter production

4

Production & QC

Quality control documented throughout production

5

Delivery & Acceptance

Settle the balance and complete acceptance

Payment & Acceptance Terms

Project Deposit

Standard, custom, and large orders all require a deposit of at least 50% of the contract value to begin. The timing for the remaining balance is agreed separately for each project.

Acceptance

Please complete acceptance within 1 month of receiving the product or report. Any concerns about the deliverable should be raised within this window; we will respond within 2 business days.

Disclaimer: The turnaround times and technical parameters shown on this page are typical reference ranges; the order confirmation governs the actual terms. ↑ Back to top
My List
Clear
Take My List to Inquiry
My List 0