Inquire Now
● Products / Research Services

Stable Cell Line Construction
Overexpression / Knockdown Stable Lines

We offer construction services for stable cell lines with gene overexpression or RNAi knockdown (shRNA/miRNA), covering the full process of kill-curve determination, vector construction, transfection/lentiviral infection, antibiotic selection, single-clone selection, and expression verification.

Purpose & Application Scenarios

Purpose

When you need to observe the sustained effect of a genetic change on a cell over the long term, rather than just within a brief transient expression window, a stable cell line provides a reproducible system you can use long-term — answering "how do you make this change ‘permanent’ in the cell."

Application Scenarios

Technical Principle & Applications

Technical Principle

A target vector (plasmid or lentivirus) carrying a resistance gene is introduced into cells. A kill curve first determines the optimal selection concentration, and an antibiotic (such as puromycin or G418) is then used to continuously select a stable cell population that has integrated and expresses the transgene. A stable cell line is obtained after single-clone isolation and qPCR/WB verification.

Applications

Long-term gene function research, drug screening models, reporter gene cell lines, seed cells for in vivo tumorigenesis experiments, etc.

Service Advantages

Full-Process Coverage

One-stop coverage from kill curve through vector construction, infection, selection, single-clone isolation, and verification

Typically 2-3 Months

Delivered as a T25 stable line with a verification report

qPCR/WB Verified

Expression level confirmed by qPCR/WB after single-clone isolation

Long-Term Stable Expression

Maintains a stable phenotype across many passages, unlike transient transfection

Delivery

Stable Cell Line ConstructionAbout 2-3 months
Deliverables: a T25 stable cell line and a verification report. Cell background and selection antibiotic concentration will be confirmed by a technical advisor based on the experimental design.

Ordering Process

1

Requirement Discussion

Submit your experimental plan and objectives

2

Proposal Confirmation

Technical advisor confirms the protocol and timeline

3

Deposit & Order Placement

Pay a deposit of at least 50% of the project cost to enter production

4

Production & QC

Quality control documented throughout production

5

Delivery & Acceptance

Settle the balance and complete acceptance

Payment & Acceptance Terms

Project Deposit

Standard, custom, and large orders all require a deposit of at least 50% of the contract value to begin. The timing for the remaining balance is agreed separately for each project.

Acceptance

Please complete acceptance within 1 month of receiving the product or report. Any concerns about the deliverable should be raised within this window; we will respond within 2 business days.

Disclaimer: The turnaround times and technical parameters shown on this page are typical reference ranges; the order confirmation governs the actual terms. ↑ Back to top
My List
Clear
Take My List to Inquiry
My List 0