Inquire Now
● Products / Research Services

Gene Editing
Knock-In · Site-Directed Mutagenesis · Conditional Editing

Building on gene knockout, we further offer precision gene editing services including knock-in, site-directed mutagenesis, tag insertion (such as GFP/Flag/HA fusion), and conditional knockout (Cre-loxP), covering both cell and model animal levels.

Purpose & Application Scenarios

Purpose

When you need to precisely introduce a mutation or knock in a tag in a cell or animal model — not just perform a simple gene knockout — precision gene editing is the core technology for achieving that goal — answering "how do you make exactly the change you want, at a specific location in the genome."

Application Scenarios

Technical Principle & Applications

Technical Principle

Precision editing relies on the homology-directed repair (HDR) mechanism — while Cas9 cuts to create a DSB, a homologous template DNA carrying the intended change (an ssODN or targeting vector) is provided as a reference for repair, achieving a precise base substitution or site-specific insertion of an exogenous sequence. Compared with NHEJ, HDR editing is precise and controllable but less efficient, requiring optimization of the sgRNA site and donor design.

Applications

Point mutation functional research, endogenous tag knock-in, reporter cell line construction, disease mutation modeling, gene therapy research, etc.

Service Advantages

Precise, Controllable Editing

Homology-directed repair (HDR) achieves precise modification

Typically 2-4 Months

Assessed by editing type and cell line difficulty

Sequencing-Verified Delivery

Edited cell lines confirmed by sequencing

Cell & Animal Levels Both Covered

Covers editing needs for both cell lines and model animals

Delivery

Gene Editing (by type/difficulty)Generally 2-4 months
Deliverables: a sequencing-verified edited cell line. For complex plans such as conditional editing (Cre-loxP), we recommend thoroughly discussing design feasibility with a technical advisor in advance.

Ordering Process

1

Requirement Discussion

Submit your experimental plan and objectives

2

Proposal Confirmation

Technical advisor confirms the protocol and timeline

3

Deposit & Order Placement

Pay a deposit of at least 50% of the project cost to enter production

4

Production & QC

Quality control documented throughout production

5

Delivery & Acceptance

Settle the balance and complete acceptance

Payment & Acceptance Terms

Project Deposit

Standard, custom, and large orders all require a deposit of at least 50% of the contract value to begin. The timing for the remaining balance is agreed separately for each project.

Acceptance

Please complete acceptance within 1 month of receiving the product or report. Any concerns about the deliverable should be raised within this window; we will respond within 2 business days.

Disclaimer: The turnaround times and technical parameters shown on this page are typical reference ranges; the order confirmation governs the actual terms. ↑ Back to top
My List
Clear
Take My List to Inquiry
My List 0