Inquire Now
● Products / Research Services

CAR Molecule Delivery
Chimeric Antigen Receptor Vector Construction

We design, construct, and viral-package chimeric antigen receptor (CAR) molecule vectors, covering single-chain antibody (scFv) selection, co-stimulatory domain combination optimization, and lentiviral/retroviral vector construction — providing molecular delivery tools for CAR-T, CAR-NK, and other cell therapy research.

Purpose & Application Scenarios

Purpose

When you need to design and deliver a chimeric antigen receptor molecule for CAR-T/CAR-NK cell therapy research, professional CAR vector construction helps you correctly assemble a complex multi-domain design and deliver it into immune cells — answering "how do you get immune cells to recognize and attack the target antigen."

Application Scenarios

Technical Principle & Applications

Technical Principle

A CAR molecule is typically constructed by linking an extracellular antigen-recognition domain (scFv), a hinge region, a transmembrane domain, and intracellular co-stimulatory signaling domains (such as CD28 or 4-1BB) in series with a CD3ζ signaling domain. After lentiviral or retroviral packaging, T cells/NK cells are infected to express the CAR molecule, enabling them to specifically recognize and kill target antigen-positive cells.

Applications

CAR-T/CAR-NK cell therapy research, tumor immunotherapy basic research, early-stage cell therapy product development, etc.

Service Advantages

Flexible Domain Combinations

Co-stimulatory domains (CD28/4-1BB, etc.) can be combined as needed

Typically 4-8 Weeks

Exact timeline assessed by vector design complexity

Sequence-Verified Delivery

Vectors/virus delivered after sequencing verification

T & NK Cell Compatible

Covers both CAR-T and CAR-NK delivery scenarios

Delivery

CAR Molecule Delivery Vector ConstructionAbout 4-8 weeks, depending on design complexity
Deliverables: plasmid/viral vector and a sequence verification report. Please discuss scFv and co-stimulatory domain selection thoroughly with a technical advisor in advance.

Ordering Process

1

Requirement Discussion

Submit your experimental plan and objectives

2

Proposal Confirmation

Technical advisor confirms the protocol and timeline

3

Deposit & Order Placement

Pay a deposit of at least 50% of the project cost to enter production

4

Production & QC

Quality control documented throughout production

5

Delivery & Acceptance

Settle the balance and complete acceptance

Payment & Acceptance Terms

Project Deposit

Standard, custom, and large orders all require a deposit of at least 50% of the contract value to begin. The timing for the remaining balance is agreed separately for each project.

Acceptance

Please complete acceptance within 1 month of receiving the product or report. Any concerns about the deliverable should be raised within this window; we will respond within 2 business days.

Disclaimer: The turnaround times and technical parameters shown on this page are typical reference ranges; the order confirmation governs the actual terms. ↑ Back to top
My List
Clear
Take My List to Inquiry
My List 0