Inquire Now
● Products / Research Services

BiFC (Bimolecular Fluorescence Complementation)
Bimolecular Fluorescence Complementation · Live-Cell Interaction Visualization

Candidate interacting proteins are each fused to the N- or C-terminal fragment of a fluorescent protein; if the two proteins interact, the fragments refold and restore fluorescence, allowing direct visualization of the protein interaction and its subcellular location in live cells.

Purpose & Application Scenarios

Purpose

Once Co-IP or another method has given you preliminary evidence that two proteins interact, and you want to directly "see" where and how that interaction occurs in a live cell, BiFC provides visual evidence — answering "where in the cell does this protein interaction actually happen."

Application Scenarios

Technical Principle & Applications

Technical Principle

A fluorescent protein (e.g., Venus/YFP) is split into non-fluorescent N- and C-terminal fragments, each fused to a candidate interacting protein. If the two proteins interact, the fragments are brought into proximity and refold into a functional fluorophore, producing a detectable fluorescence signal that directly reflects where and how strongly the interaction occurs.

Applications

Verification of protein interactions in live cells, and research into interaction dynamics and localization.

Service Advantages

Live-Cell Verification

No lysis required, preserves the physiological state

Typically 3-4 Weeks

Covers vector construction, transfection, and imaging

Fluorescence Image Delivery

Includes an interaction analysis report

Localization Data Included

Interaction verification and subcellular localization delivered together

Delivery

BiFC AssayAbout 3-4 weeks
Deliverables: fluorescence images and an interaction analysis report. We recommend confirming the candidate interacting protein pair and cell background with a technical advisor in advance.

Ordering Process

1

Requirement Discussion

Submit your experimental plan and objectives

2

Proposal Confirmation

Technical advisor confirms the protocol and timeline

3

Deposit & Order Placement

Pay a deposit of at least 50% of the project cost to enter production

4

Production & QC

Quality control documented throughout production

5

Delivery & Acceptance

Settle the balance and complete acceptance

Payment & Acceptance Terms

Project Deposit

Standard, custom, and large orders all require a deposit of at least 50% of the contract value to begin. The timing for the remaining balance is agreed separately for each project.

Acceptance

Please complete acceptance within 1 month of receiving the product or report. Any concerns about the deliverable should be raised within this window; we will respond within 2 business days.

Disclaimer: The turnaround times and technical parameters shown on this page are typical reference ranges; the order confirmation governs the actual terms. ↑ Back to top
My List
Clear
Take My List to Inquiry
My List 0